 |
| Assignment name :
|
Post Implementation Report and Project Impact Evaluation Report – Uma Oya Multipurpose Development Project |
|
| Specifications :
|
• Location: Sri Lanka
• Status: in the operational phase
• Type: Two Gravity RCC Dam
• Height: about 45 meters
• Total Capacity: about 600 m3
• Surface Area: 18.5 ha
• Install capacity: 120 MW
• Vertical Shaft: 618 m
|
|
| Role on the assignment:
|
Post Implementation Report and Project Impact Evaluation Report |
|
| Client:
|
The secretary, Ministry of Agriculture, livestock, land and irrigation, Irrigation Division |
|
|
|
|
|
|
|
|
|
|